World Leisure Jobs - 'One of the world's top 5 stadiums': Atletico Madrid's Wanda Metropolitano ready for action...
19 Jun 2018 World leisure: news, training & property
 
 
HOME
JOBS
NEWS
FEATURES
PRODUCTS
FREE DIGITAL SUBSCRIPTION
PRINT SUBSCRIPTION
ADVERTISE
CONTACT US
Sign up for FREE ezine
Latest news

12 Sep 2017

'One of the world's top 5 stadiums': Atletico Madrid's Wanda Metropolitano ready for action
BY Kim Megson

The open tensile roof structure, built by construction firm FCC, weighs around 6,336 tons

The open tensile roof structure, built by construction firm FCC, weighs around 6,336 tons
photo: Cruz y Ortiz

The striking new home for Spanish football side Atletico Madrid is ready to host its first match, with construction finally completed on the 68,000 capacity Wanda Metropolitano stadium.

The club has invested a reported €300m on the new ground – which replaces the Vicente Calderon Stadium, its home of over 50 years – in order to propel them to the sport’s elite level.

Spanish architecture practice Cruz y Ortiz were responsible for the project. Rather than building a new stadium from scratch, they were tasked with renovating and expanding the existing Estadio Olímpico de Madrid – a 20,000-seat athletics venue built in 1994.

Parts of the original concrete stand have been incorporated into the new stadium, with much of the remainder demolished in order for new stands to be added, more than trebling the capacity.

“Our aim was not to recreate the famous atmosphere appearance of the Calderon,” the studio’s co-founder Antonio Cruz told CLADglobal. “This was a new proposition, and our responsibility was to find something new to help the club take another step forward. At this moment, Atletico are already one of the top teams in Europe, and this stadium can take them to the very top.”

Cruz said the biggest challenge was unifying the existing elements of the Estadio Olímpico structure with the newly-constructed ones.

“Our answer was to cover it with a new roof,” he explained. “It brings everything together as one building. We’ve adopted a new technique never used before to make a canopy membrane – using an exterior steel and double height compression ring, an interior traction ring and two sets of radial cables. It’s the most innovative part of this project.”

The open tensile structure, built by construction firm FCC, weighs around 6,336 tons, and the membrane occupies a surface area of 83,053sq m. A video showing its installation can be viewed below:



Advanced technology has also been integrated into the new stadium, including three jumbo screens, a videomapping facade on the exterior of the stadium, and 1,200 wifi elements to ensure easy internet access.

“The club wanted advanced technology from the beginning,” said Cruz. “We enjoyed and appreciated that challenge. We were set the target of building one of the five best stadiums in the world and a building that can be used long into the future, hosting top national and international finals."

Other features of the stadium include a fan plaza open on matchdays, where spectators can enjoy music, entertainment and interviews with notable club figures. A retail megastore will be among 16 commercial outlets, and a club museum is also planned.

Atletico were permitted by the Spain’s La Liga to play their first three games of the new season away from home, allowing workers to add the final touches to the Wanda Metropolitan. The stadium will host its first match on 16 September, for the league visit of Malaga.

A timelapse video released by the club shows the final touches being made in preparation.




Atletico are the latest La Liga side to upgrade their home ground. New stadiums are also in the pipeline for La Liga rivals Barcelona and Real Madrid, with architecture firms Nikken Sekkei and gmp architekten respectively designing those projects.



Connect with
World Leisure
Magazine:
View issue contents
Sign up:
Instant Alerts/zines

Print edition
 

News headlines
Construction begins on Michael Maltzan Architecture's vast Inuit Art Centre
Construction begins on Michael Maltzan Architecture's vast Inuit Art Centre   19 Jun 2018

Ground has broken on a new museum in Winnipeg that will be the largest single gallery space in the world devoted to Inuit art, culture, and history. .... more>>
Kelly Hoppen designs 22,000sq ft nature-inspired spa for Celebrity Cruises
Kelly Hoppen designs 22,000sq ft nature-inspired spa for Celebrity Cruises   19 Jun 2018

Celebrity Cruises has unveiled its new The Spa on Celebrity Edge, a 22,000sq ft holistic spa inspired by nature and designed by Kelly Hoppen, who also .... more>>
Origami-inspired 'AquaLagoon' opens at Disney and Center Parcs' nature village
Origami-inspired 'AquaLagoon' opens at Disney and Center Parcs' nature village   18 Jun 2018

The star attraction at Disney and Center Parcs’ new Villages Nature development outside Paris has been completed. The practice of French architect .... more>>
Inquest into Dreamworld deaths underway in Queensland
Inquest into Dreamworld deaths underway in Queensland   18 Jun 2018

An inquest into the ride malfunction that killed four at the Dreamworld theme park in Australia is underway, with a Queensland court hearing there had .... more>>
Company profile


FaulknerBrowns Architects

FaulknerBrowns is renowned for outstanding performance in the delivery of innovative, award-winning and record-breaking buildings.

View full profile>>

Catalogue gallery


Featured Supplier

Matthew Januszek discusses the future of fitness with industry leaders at IHRSA

Matthew Januszek discusses the future of fitness with industry leaders at IHRSA

IHRSA, one of the biggest health and fitness shows worldwide, draws the industry’s top minds who see where fitness is heading. More>>




in this issue

• Growth drivers of fitness identified
• 'Fitness at Work' guidance published
• Westin to make UK debut in London



World Leisure jobs




Swimming Teachers
Salary: Competitive rate of pay
Location: London Borough of Barking and Dagenham, UK
Company: Everyone Active
Chief Operating Officer
Salary: £60,000
Location: Weybridge, Surrey, UK
Company: Brooklands Museum Trust Ltd
Data Compliance Officer
Salary: £22000 - £25000 per annum
Location: Kent, England
Company: Mytime Active
Recreation Assistant (Lifeguard)
Salary: Up to £16,187 per annum (39 hours a weeks pro rata)
Location: Workington, UK
Company: GLL
Diary dates
Powered by leisurediary.com




24 Apr - 26 Nov 2018

MAPIC Russia

Expocentre, Moscow, Russia


18-19 Jun 2018

Sports & Leisure Forum

Radisson Blu Hotel, London Stansted, Stansted, United Kingdom



Leisure Management magazine 2016 issue 1
Leisure Management
2016 issue 1

View issue contents
View on turning pages
Download PDF
  Editor’s letter: Failing the elderly
Liz Terry shares her thoughts More>>
  Disruption: Rule breakers
Leisure architecture that’s pushing boundaries and upturning expectations More>>


Leisure Management magazine 2015 issue 1

Leisure Management
2015 issue 1

View issue contents
View turning pages
Download PDF
  Innovation: Naoko Ito
Japanese creative lab Party are behind the innovative design of Narita Airport’s Terminal 3 More>>
  On the cover: Bear Grylls
Bear Grylls - Changing the way people think about exercise More>>


Published by The Leisure Media Company Ltd Portmill House, Portmill Lane, Hitchin, Herts SG5 1DJ. Tel: +44 (0)1462 431385 | Contact us | About us | © Cybertrek Ltd